Just about to finish up the last item I had planned for the Sinclair buildings- the back wall in the shared patio. All the main woodwork is done and I'm going to do the final trim and stain/seal in the next several days. The wall is a combination of new cedar, some old shiplap pine that came out of a house we bought then demoed, and the lath is from our 1893 building we remodeled back in 2015. The transom windows came out of the Station office.

IMG_8777.jpg
Last edited by DH44; Fri Aug 16 2024 01:58 PM.