Big week. Got the power turned off and the meter is being relocated and the roof torn off today.
Spent a large part of the week addressing the structure. After all of the rafter ends were replaced there was up to 3" of sag in the center of the building. Call to the local builder/top-notch welder and we installed both a wooden 12' beam and a 28' 10" steel ibeam. Rented a scissor lift and got lots of help and jacked up the beam, and the ceiling, and got the ceiling straight and strong. Not going anywhere now, hopefully.
Also started tearing off the old tile-replacing stuff and have the tile roof specialist lined up to come out sometime this week or next to get an idea about rebuilding it.

24.jpg 25.jpg 26.jpg 23.jpg