Thanks for the update! Ditto what buzzy56 says, I think a lot of us enjoy seeing the progress you are making on this station renovation.
Regards, Jim
I collect gas pump salt and pepper shakers and the plastic coin banks made by AVSCO.
|
|
|
Please - NO offers to Buy or Sell in this forum category
Statements such as, "I'm thinking about selling this." are considered an offer to sell.
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Apr 2016
Posts: 2,065 Likes: 22
Veteran Member
|
Veteran Member
Joined: Apr 2016
Posts: 2,065 Likes: 22 |
Really awesome to see this kinda of love and dedication given to an old and deserving piece of history. Fantastic progress!
Last edited by RedHat; Sat Jun 26 2021 10:25 PM.
Looking for Michelin items + NJ oil company related items (Mohawk, Guardian, Whiz, etc) + animal-related petroliana + Gargoyle/Shell/Sinclair items
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jun 2021
Posts: 5
Member
|
Member
Joined: Jun 2021
Posts: 5 |
This is going to be stunning when finished. I hope sometime when I'm up in Dallas I can drive by and appreciate this beauty in person. That tin ceiling is fire!
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
Another update- got the west parking area poured and completed Friday while dodging rain showers. The concrete guy did a really good job. Now all the concrete work remaining is the "courtyard" area and he should get to that this week or next, hopefully.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
We got a lot of work done this weekend. I spent some time up on the ladder replacing broken tiles. My legs are still rubbery from going up and down the ladder. Each one of the tiles has to be chiseled out by hand so the surrounding plaster/stucco doesn't suffer too much damage.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
I think I'm done on the west side- all the tiles that I am going to replace are replaced. Still have to go back and grout them. I think they look pretty good, 4 on this side had to be replaced.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
The roof over the addition to the secondary building was was a disaster. The original roof didn't have enough slope, and it was rotted. Then the previous owners added another roof over it, and it rotted. So they shaved 2x6s and put tin over the whole mess, and it leaked. All of the old roof was ripped off and a new roof built. It was made heavy-duty since the AC compressor is going on top of it.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
I spent all day yesterday in the bathroom. And no, it wasn't due to bad burritos for lunch. The wall between the interior men's room and the exterior ladies room was a water-damaged, termite-devoured mess. A sledgehammer, couple other hammers, grinder and shovel and wheelbarrow and the wall is gone. Going to re-frame the wall and foam insulate it.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
Was able to salvage the original sign for the men's room- the varnish/paint on it cleaned up nicely.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2020
Posts: 108 Likes: 40
Petro Enthusiast
|
OP
Petro Enthusiast
Joined: Jul 2020
Posts: 108 Likes: 40 |
Hope to get the windows and doors that are remaining in sometime soon. The HVAC equipment that we ordered is in and at the shop, ready for installation when it's time. The interior bathrooms in the secondary building are framed and electrical is in process. I'll get some photos of the framing when I get by there today.
I've learned a lot on this reno. Mostly, though, I've learned don't say what you're going to do until after you've done it. Every step of the way things change for a variety of reasons and what you thought would do changes. But overall, it's been a blast.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Aug 2014
Posts: 1,676 Likes: 74
Veteran Member
|
Veteran Member
Joined: Aug 2014
Posts: 1,676 Likes: 74 |
All I can say is WOW! It is more than impressive to see what you have accomplished to date. Thanks again for the update. I eagerly look forward to the next one.
Regards, Jim
I collect gas pump salt and pepper shakers and the plastic coin banks made by AVSCO.
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Aug 2004
Posts: 1,664 Likes: 17
Veteran Member
|
Veteran Member
Joined: Aug 2004
Posts: 1,664 Likes: 17 |
This is fast becoming one of my favorite threads. Thank you for sharing!
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Jul 2021
Posts: 6
Member
|
Member
Joined: Jul 2021
Posts: 6 |
Quite a project. Should be great when finished!
|
|
|
 Re: Sinclair Station- The Renovation begins
|
Joined: Aug 2015
Posts: 93 Likes: 5
Active Member
|
Active Member
Joined: Aug 2015
Posts: 93 Likes: 5 |
Like many on here, I love following this! Hands down one of the coolest projects I have seen!
|
|
|
|
|
|